2.4 Application for Permission in
Construction/ Modification/ Demolition of Factory Building

Details
In applying for the permission in construction/ modification/ removal of factory building in the Industrial Estate, it is The Procedures that can be continuously done immediately after applying for permission in land use and conducting business in the Industrial Estate; in this stage, the entrepreneur has to understand concerned laws such as:
• Industrial Estate Authority of Thailand Act B.E. 2522 (1979)
• Factory Act B.E. 2535 (1992)
• Building Control Act B.E. 2522 (1979)
• Architecture Profession Act B.E. 2543 (2000)
• Condominium Act (No. 4) B.E. 2551 (2008)
• Engineering Act B.E. 2542 (1999)
• City Planning Act (No. 3) B.E. 2535 (1992)
2.4.1.1 Contents: Meaning of building
2.4.1.2 Contents of the design of the building
2.4.2 Applying for permission to construct factory building under GorNorAor. 02/1
2.4.3 Applying for permission in construction of the factory building under GorNorAor. 02/3
Details
In applying for the permission in construction/ modification/ removal of factory building in the Industrial Estate, it is The Procedures that can be continuously done immediately after applying for permission in land use and conducting business in the Industrial Estate; in this stage, the entrepreneur has to understand concerned laws such as:
• Industrial Estate Authority of Thailand Act B.E. 2522 (1979)
• Factory Act B.E. 2535 (1992)
• Building Control Act B.E. 2522 (1979)
• Architecture Profession Act B.E. 2543 (2000)
• Condominium Act (No. 4) B.E. 2551 (2008)
• Engineering Act B.E. 2542 (1999)
• City Planning Act (No. 3) B.E. 2535 (1992)
2.4.1.1 Contents: Meaning of building
2.4.1.2 Contents of the design of the building
2.4.2 Applying for permission to construct factory building under GorNorAor. 02/1
2.4.3 Applying for permission in construction of the factory building under GorNorAor. 02/3
Relavant Laws
No. List of Laws Laws
Forms
No. List of Forms Forms