2.8 Machine Test Run

Details
1. Being the person who obtains license to conduct factory business or Third Class Factory in the zone of conducting industry under Section 30 of the Factory Act B.E. 2535 (1992) with the intention and readiness to test the running of the machine; it must be the request for running machine before the actual run of machine of not less than 15 days.
2. There are complete and accurate documents for consideration
3. The period of time in Machine Test Run shall not be more than 60 days.
4. The entrepreneur of factory which is the type as specified in the List Attached with the Ministerial Regulation specifying the rules, method, and condition of Machine Test Run B.E. 2553 (2010), shall be under the specification in Item 6 of such Ministerial Regulation to be complete before giving notice on the running of machine.
Remarks:
• In case when the application or the particulars of document is not correct or is not complete and cannot be corrected/ or added at that time, the person in charge of accepting application and the applicant shall jointly sign to record the defect and particulars of document/ evidence, and specify the period of time when the applicant shall correct/ add it; if the applicant fails to correct/ add within the specified period of time, the person who accepts the application shall return the application and documents.
• The official or staff would still not consider the application and would still not count the operation period until the applicant takes action in correcting the application or in submitting complete document already.
• The period of time for the consideration of the application under this Handbook shall start when the documents are already correct and complete as examined by the staff as specified in the Public Handbook already.
• The result of the consideration shall be informed to the applicant within 7 days as from the day when the consideration is complete
The Procedure
Relavant Laws
No. List of Laws Laws
1 Factory Act, B.E.2535 (1992)
2 Ministerial Regulation: The Criteria, Procedure, And Test-Run Condition For Machinery, B.E.2553 (2010)
Forms
No. List of Forms Forms
1 The notifying form of testing themachine operation which is signed by the applicant requesting for permission or the authorized person in every page and do not copy the signature (the original copy for 1 set) which is the form as identified by the law
2 The certificate of juristic person (copy 1 set) in case of juristic person, the document shall not issued for over 3 months which having the certified signature and sealed with the company logo by the applicant in every page
3 Identification card or passport (In case of Alien) of the juristic representative ( Copy 1 set) in case of granting authority. In case of juristic person, it must have the certified signature and seal with the logo of company by the applicant in every page
4 Identification card, census registration or passport (In case of Alien) of the applicant ( Copy 1 set) . In case of natural person, the applicant must sign to certify in every page.
5 he power of attorney attaching with revenue stamp (Original 1 copy) In case of granting the authority, it must have certified signature and sealed with the company logo by the applicant in every page
6 Identification card or passport (In case of Alien) of the proxy ( Copy 1 set) In case of granting authority
7 Identification card or passport (In case of Alien) of the attorney ( Copy 1 set) In case of granting authority
8 Identification card of 2 witnesses (Copy 1 set) in case of granting the authority
9 The operational plan with the experimental period of operating machine from the starting to the ending date which not exceed 60 days (Original 1 copy)
10 The detail of procedure for controlling the problem in respect of safety and environment (Orginal 1 set)
11 The recording form of the experiment result of operating the machine (original 1 set) following the form as identified by law