Phichit Industrial Estate

Year of Establishment: 1998

Director of the Industrial Estate: Mr. Niran PongTanyakarn

Developer: Industrial Estate Authority of Thailand

Phichit Industrial Estate

Province

phichit

Location

Phichit Industrial Estate

Project Area

- 1,235 rai (494 acres)

Free Space in Estate

- General Industrial Zone: 229 rai (91.6 acres)

- I-EA-T Free Zone: 333 rai (133.2 acres)

- Residential/Commercial area: 66 rai (26.4 acres)

Distance from locations

- Bangkok: 336 kilometers

- Phitsanulok Airport: 32 kilometers

- Don Muang Airport: 310 kilometers

- Suvarnabhumi International Airport: 360 kilometers

- Bangkok Port (Klong Toey): 343 kilometers

- Laem Chabang Deep Sea Port: 467 kilometers

Price for sale / rent

Rental Prices

- General Industrial Zone: 52,000 Baht/rai/year

Location Details

79 Moo 1, Phitsanulok-Nakhon Sawan Road Km. 97-99 Nong Lum, Wachirabarami, Phichit 66220

Industrial Estate Office

79 Moo 1, Phitsanulok-Nakhon Sawan Road Km. 97-99 Nong Lum, Wachirabarami, Phichit 66220

Tel. +66 5669 2191-2

Fax +66 5669 2193

Service Rates

Maintenance Fee

- General Industrial Zone and Commercial Area: 700 Baht/rai/month

Water Tariff

- 15 Baht/cubic meter

Wastewater Treatment Fee

- Calculated according to I-EA-T methodology

Waste Disposal Fee

- Calculated according to the rate specified by the private company in charge of waste management

Convenient

Water supply system

- Production capacity: at least 6,400 cubic meters/day
- Water reserve with a capacity to provide up to 9,600 cubic meters of water/day

Road system

- Primary roads are asphaltic concrete with a 100-meter-wide right of way. The road surface is 14 meters wide with four-lane divided traffic.
- Secondary roads are asphaltic concrete with a 50-meter-wide right of way. The road surface is seven meters wide with two-lane divided traffic.

Wastewater treatment system

- Waste Stabilisation Ponds (WSP) system
- Capacity: at least 5,100 cubic meters/day.

Incinerator system

- The collection and incineration of waste are executed by an authorized private company.

Other

Telephone System

- 512 direct telephone lines in Phase 1
- Base station to transmit and receive signals for all mobile network providers

Electrical Power Supply System

- Two, 40-MVA electric power substations, each of which supplies at least 40 KVA/rai